projects

Cordial Cyber Castle Kings Tower

  • Project Details
  • Floor Plans
  • Amenities
  • Specifications
  • Gallery
  • Booking
  • Work Status
  • Location Map
KINGS & QUEENS ELEVATION_1.jpg

Details

Cordial Cyber Castle is one of the popular Residential Developments in Technopark neighborhood of Trivandrum. It is among the Ongoing Projects of Cordial Developers and Builders Pvt Ltd. The landscape is beautiful with spacious Houses.

Amenities

* Fitness Centre with most modern equipment
* Jogging Track
* Jacuzzi
* Sauna and Steam Bath
* Multi-purpose Hall
* Provision for Snack Bar
* Fully furnished Air conditioned guest suites
* Children’s Park
* Children’s Play Area (Indoor)
* Badminton Court
* Card Room & Caroms Room
* Table Tennis Room
* Reading Room and provision for Reference Library
* Cyber Corner
* Provision for Children’s Creche and Day Care
* Internet connectivity provision for each apartment
* Elegant lobby with reception area
* Intercom facility
* Sewage Treatment Plant Backup generator for lifts
* Water pumps & common lighting
* Individual letter box and name board
* Changing room for drivers and cleaners
* Drivers/ Servants toilet
* 24 hrs security and water supply.


Specifications

* Flooring : Elegant Vitrified tile flooring for the entire apartment except toilets.

* Painting : Putty with acrylic distemper for internal walls and for ceiling. (Cornice in foyer, living and dining ). Painted finish for doors.

* Toilets : Anti skid Ceramic tiles for the floor, and glazed tiles for wall up to the door height. Sanitary fixtures matching with tiles. Geyser provision and health faucet in all toilets except servant’s toilet.

* Kitchen and work area : Counter with granite top and stainless steel sink. Glazed tiles above the counter to a height of 45 cms. Single bowl sink with granite top and provision for washing machine in the work area.

* Doors : Polished Teak wood entrance door. Moulded wooden panel doors for internal doors and toilets.

* Windows : Aluminium powder coated with glazed shutters and safety grills.

* Electrical : All wiring with power plugs. Adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB metre. Modular switches.

* Generator : Generator backup for elevators, common lighting water pumps and designated points in each apartment.

* Elevators : Eight Numbers. Fully Automatic. (including 2 bed elevators)

* Cable TV : Connection in living and Master bedroom (subject to prevailing government rules)

* Telephone : Wiring for Telephone in Living and Master bedroom.

* Water supply : Water supply through sump and over head tank.

Air-Conditioning : Split AC provision in all bedrooms. Wired provision in master bedroom for fixing AC.

Fire Safety Features : Fire Protection systems as per rules.

Car Parking : Covered car parking (at extra cost.)

No bookings.

Work Status

***structural work- completed ***Block work- completed ***Elec chasing- completed ***Metal box fixing- completed ***GI Wire pulling- completed ***DB Dressing- completed ***Door frames fixing- completed ***Internal Plastering- completed ***Water supply piping- completed ***Internal plumbing- completed ***Toilet waterproofing- completed ***Floor tiling up to 15 th floor completed 14C,14F not done ***Toilet dadoing- up to 15th floor completed 14C,14F not done ***Electrical wiring- completed ***Wooden Doors- upto15th floor completed 14th floor not completed ***Aluminum Windows- up to12th floor completed ***Window grills- completed ***False ceiling works -up to 13th floor completed ***Cornice works -completed ***Balcony grills- completed ***Kitchen granite -15th floor progress ***Kitchen dadoing- 15th floor progress ***Painting primer- upto7th floor completed ***Painting first coat- 2nd floor to 5th floor completed ***Elec switches, etc- up to 15th floor completed ***Sanitary fixtures- Not started ***Elec testing -Not started ***Plumbing testing- Not started ***Painting final Coat -Not started *** kings tower top water tank water proofing and plastering completed ***Kings tower External plastering work completed ***kings tower roof top parapet wall and open terrace parapet wall grill work progress ***Kings tower External 1st coat painting work 30% completed ***Kings tower basement floor concreting 100% completed ***kings tower 1st coat door polishing work upto 15th floor completed ***kings tower up to 15th floor common area and staircase tile work completed ***kings tower Drinking water tank for basement floor RCC wall plastering and cover slab completed ***kings tower door frames beading(architray) work progress ***kings tower common staircase hand rail 1st coat painting &polishing completed ***Kings Tower parking area concreating


location map

Location Map





emi calculator loan eligibility area convertor faq



Photo / Video Gallery Testimonials Business Opportunities Event Archives Downloads

locate a
project!!



quick contact




Newsletter Signup



Home  |   About us  |   Projects  |   Services  |   Associates  |   Enquiry  |   NRI FAQ  |   Careers  |   Usefull links  |   Contact us
© 2011 Cordial Developers and Builders. All Rights Reserved   |  Web Designers India