projects

Cordial-Cyber Castle Queens Tower, Near Technopark.

  • Project Details
  • Floor Plans
  • Amenities
  • Specifications
  • Gallery
  • Booking
  • Work Status
  • Location Map
KINGS & QUEENS ELEVATION.jpg

Details

Cordial Cyber Castle is one of the popular Residential Developments in Technopark neighborhood of Trivandrum. It is among the Ongoing Projects of Cordial Developers and Builders Pvt Ltd. The landscape is beautiful with spacious Houses.

Amenities

* Fitness Centre with most modern equipment
* Jogging Track
* Jacuzzi
* Sauna and Steam Bath
* Multi-purpose Hall
* Provision for Snack Bar
* Fully furnished Air conditioned guest suites
* Children’s Park
* Children’s Play Area (Indoor)
* Badminton Court
* Card Room & Caroms Room
* Table Tennis Room
* Reading Room and provision for Reference Library
* Cyber Corner
* Provision for Children’s Creche and Day Care
* Internet connectivity provision for each apartment
* Elegant lobby with reception area
* Intercom facility
* Sewage Treatment Plant Backup generator for lifts
* Water pumps & common lighting
* Individual letter box and name board
* Changing room for drivers and cleaners
* Drivers/ Servants toilet
* 24 hrs security and water supply.


Specifications

* Flooring : Elegant Vitrified tile flooring for the entire apartment except toilets.

* Painting : Putty with acrylic distemper for internal walls and for ceiling. (Cornice in foyer, living and dining ). Painted finish for doors.

* Toilets : Anti skid Ceramic tiles for the floor, and glazed tiles for wall up to the door height. Sanitary fixtures matching with tiles. Geyser provision and health faucet in all toilets except servant’s toilet.

* Kitchen and work area : Counter with granite top and stainless steel sink. Glazed tiles above the counter to a height of 45 cms. Single bowl sink with granite top and provision for washing machine in the work area.

* Doors : Polished Teak wood entrance door. Moulded wooden panel doors for internal doors and toilets.

* Windows : Aluminium powder coated with glazed shutters and safety grills.

* Electrical : All wiring with power plugs. Adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB metre. Modular switches.

* Generator : Generator backup for elevators, common lighting water pumps and designated points in each apartment.

* Elevators : Eight Numbers. Fully Automatic. (including 2 bed elevators)

* Cable TV : Connection in living and Master bedroom (subject to prevailing government rules)

* Telephone : Wiring for Telephone in Living and Master bedroom.

* Water supply : Water supply through sump and over head tank. Air-Conditioning : Split AC provision in all bedrooms. Wired provision in master bedroom for fixing AC. Fire Safety Features : Fire Protection systems as per rules.

* Car Parking : Covered car parking (at extra cost.)

No bookings.

Work Status

***structural work completed ***Block work completed ***Elec chasing completed ***Metal box fixing completed ***GI Wire pulling completed All floor E flat not Completed ***DB Dressing completed All floor E flat not Completed ***Door frames fixing completed ***Internal Plastering completed All floor E flat not Completed ***Water supply piping completed All floor E flat not Completed ***Internal plumbing completed All floor E flat not Completed ***Toilet waterproofing completed All floor E flat not Completed ***Floor tiling completed All floor E flat not Completed ***Toilet dadoing completed All floor E flat not Completed ***Electrical wiring completed Finishing work not started at all E flats ***Wooden Doors up to 12th floor completed ***Aluminum Windows up to 10th floor completed 11th&12th floor progress ***Window grills completed ***False ceiling works 2nd floor to 10th floor completed ***Cornice works up to 12th floor completed All floor E flat not Completed ***Balcony grills completed ***Kitchen granite 10th floor progress ***Kitchen dadoing 9th floor completed 10th floor progress ***Painting primer 2nd floor to 5th floor completed ***Painting first coat Not started ***Elec switches, etc up to 5th floor completed ***Sanitary fixtures Not started ***Elec testing Not started ***Plumbing testing Not started ***Painting final Coat Cleaning ***Queens tower overhead water tank inside water proofing and plastering 80%completed ***Queens tower External plastering work 95% completed ***Queens tower roof top parapet wall and open terrace parapet wall grill work progress ***Queens tower External 1st coat painting work started ***Queens tower basement floor concreting 100% completed ***Queens tower 1st coat door polishing work upto 8th floor completed ***Queens tower up to 11th floor common area and staircase tile work completed ***Queens tower roof top parapet wall plastering work completed ***Queens tower lift machine room plastering & water tank inside plastering completed ***Bed elevator (13 passenger) lift erection work 90%completed


Location Map

Location Map





emi calculator loan eligibility area convertor faq



Photo / Video Gallery Testimonials Business Opportunities Event Archives Downloads

locate a
project!!



quick contact




Newsletter Signup



Home  |   About us  |   Projects  |   Services  |   Associates  |   Enquiry  |   NRI FAQ  |   Careers  |   Usefull links  |   Contact us
© 2011 Cordial Developers and Builders. All Rights Reserved   |  Web Designers India